Bridges & Tunnels

Owner: Tri-borough Bridge and Tunnel Authority
Location: RFK Bridge Manhattan , NY
Client: TBTA
Value: $10,600,000
RFK BRIDGE UTILITY REHABILITATION
MTA Bridges and Tunnel Authority is making needed repairs and improvements to the 1930s-era flagship bridge. Project consists of installing manholes, duct banks, transformer vaults, power and communication lines in addition to the installation of new 5kv distribution switchgear and 5kv underground distribution.

Owner: NYS Dept of Transportation
Location: Westchester County , NY
Client: Tutor Perini
Value: $1,280,000
MAJOR BRIDGE REHAB OF THE TACONIC STATE PARKWAY NB BRIDGE OVER THE NEW CROTON RESERVOIR
Installation of ITS equipment, traffic intersections and electrical installation on Northbound Croton Reservoir Bridge.

Owner: NYCDOT
Location: Brooklyn , NY
Client: Posillico Tully JV
Value: $125,000
ATLANTIC RAIL YARDS, CARLTON AVE BRIDGE
Reconfiguration and reinstallation of new and existing traffic equipment, conduit, and cabling for the Carlton Ave Bridge reconstruction.

Owner: NYC Dept. of Transportation
Location: Manhattan , NY
Client: Ferreira Construction Corp.
Value: $79,750
78TH STREET PEDESTRIAN BRIDGE
Installation of new street light poles and fixtures, as well as cabling for the reconstruction of the 78th Street Pedestrian Bridge.

Owner: NYC Dept of Transportation
Location: Grand Central Parkway/ 94th St Queens , NY
Client: Tully Construction
Value: $6,250,000
GRAND CENTRAL PARKWAY 94TH STREET IMPROVEMENTS
Total renovation of the electrical distribution and lighting system for approximately two miles of highway in front of LaGuardia Airport on the Grand Central Parkway. Includes, replacing four local traffic intersections, new lighting on the 94th street bridge and relocation of its associated electrical components.

Owner: MTA Bridges & Tunnel Authority
Location: Throgs Neck Bridge Bronx/Queens , NY
Client: MTA
Value: $6,100,000
THROGS NECK BRIDGE – REHABILITATION OF ELECTRICAL SYSTEMS
Completion of the entire electrical system at the Throgs Neck Bridge. The bridge was operated under temporary generator power for 9 months. The 5kV Substation furnished all power to the Throgs Neck Bridge, Operational Building, Toll Complex and Maintenance Facility. Safety requirements included boat patrol during working hours.

Owner: Dept of Transportation
Location: Manhattan Bridge New York , NY
Client: Yonkers Contracting
Value: $4,000,000
MANHATTAN BRIDGE
Completion contract covering upgrade power and lighting of Manhattan Bridge and installation of Traffic Control System.

Owner: Triborough Bridge & Tunnel Authority
Location: Whitestone Bridge Bronx , NY
Client: Triborough Bridge & Tunnel Authority
Value: $1,500,000
WHITESTONE BRIDGE ACOUSTICAL MONITORING SYSTEM
E-J was the prime contractor on this installation of prototype acoustical monitoring system consisting of acoustical sensors, cabling and processing equipment, 8,000 feet of multi conductor coaxial cable and 102 sensors installed on the bridges support cables at elevations exceeding 300 feet.

Owner: MTA Bridges & Tunnel Authority
Location: Throgs Neck Bridge Bronx/Queens , NY
Client: First Indemnity Insurance
Value: $450,000
THROGS NECK BRIDGE
Completion of the entire electrical system at the Throgs Neck Bridge. The bridge was operated under temporary generator power for 9 months. The 5kV Substation furnished all power to the Throgs Neck Bridge, Operational Building, Toll Complex and Maintenance Facility. Safety requirements included boat patrol during working hours.

Owner: Port Authority of NY & NJ
Location: Holland Tunnel - NY and NJ sides & NY & NJ River & Land Buildings
Client: T. Moriarity & Son, Inc.
Value: $28,000,000
HOLLAND TUNNEL
Furnish & install 13.8kV, 480V, 120/208V distribution equipment and feeders & circuitry. Furnish & install UPS, fiber optic, direct transfer trip and automatic control systems and motor work.
Rehabilitation of all electrical and mechanical ventilation equipment. This project is the total replacement of a fully redundant electrical and mechanical system for the ventilation of the Holland Tunnel. Equipment being replaced is medium voltage switchgear, 480V switchgear and motor control centers. This equipment resides in four buildings, two New York, two in New Jersey. Equipment removals and replacements must be staged perfectly so that there is no interruption to tunnel service.

Owner: New York City Department of Transportation
Location: Hutchinson River Parkway at Westchester Avenue Bronx , NY
Client: Hellman Electric
Value: $300,000
WESTCHESTER AVENUE BRIDGE DAMAGE SURVEILLANCE SYSTEM
Installation and start-up of sensors, cameras, controls and processors for the Bridge Damage Surveillance System as designed By Pure Technologies. The project criteria included identifying a vehicle collision with the bridge structure, capturing video of the offending vehicle’s side profile and license plate in real time, and then emailing these videos to the owner. The project installation required completing our scope of work while maintaining the traffic flow of the Hutchinson River Parkway.